Water supply of Neka and Behshahr cities from Gelevard Dam
The purpose of the project is supply, treatment and transfer of drinking and industrial water to Behshahr and Neka. In this project, the raw water is transferred from Gelevard Dam near Tazeh Abad Village in the south of Behshahr city to treatment facilities. After treatment, water is transferred to cities and villages through the water pipeline.
Future
2018/09/29
2018/11/13
Manager

Mazandaran Regional Water Company

Goals
The purpose of the project is supply, treatment and transfer of drinking and industrial water to Behshahr and Neka. In this project, the raw water is transferred from Gelevard Dam near Tazeh Abad Village in the south of Behshahr city to treatment facilities. After treatment, water is transferred to cities and villages through the water pipeline.
 
Schedule

Design and construction

Executive Actions

Final dimensions and diameter of tunnel: at least 3 m

 The starting elevation of the tunnel corresponding to hydraulic profile of the main transmission line: 620 m above the sea level

 The end elevation of the tunnel corresponding to the hydraulic profile of the main transmission line: 608 m above sea level

 Hydraulic slope of the tunnel route: 0.2

 The total length of the access road to the tunnel entrance: approximately 1120 m

 The length of the pipeline to the proposed tunnel entrance point: about 346 m

 The approximate length of the tunnel: about 5632 m

 The length of pipeline from the tunnel to the water treatment plant: about 5743 m. Of this, about 1170 m is the length of the access road to the entrance to the tunnel.

 The required road width for connecting paths to the starting point of the inlet trench and from the end of outlet trench Abbas Abad forest road is 5 m.

Geography Location

Mazandaran Province in Behshahr and Neka