Thursday Dec 5, 2024
Studies of the Drinking and Industrial Water Supply for the Cities and Villages along the Southern Course of the Zayanderud river
Project name: Studies of the Drinking and Industrial Water Supply for the Cities and Villages along the Southern Course of the Zayanderud river
Completed
2018/09/29
2019/11/27
Manager

Chaharmahal and Bakhtiari Regional Water Company

Goals

Drinking and to some extent industrial water supply to 10 cities and 14 villages;  

Schedule

1st and 2nd phase studies and supervision (3rd Phase)

Executive Actions
  • Urban population in the plan area: 423129
  • Rural population in the plan area: 33135
  • Water allocation to tourism: 350 lit/s
  • Water transmission capacity: 1750 lit/s
  • Headgate and pumping stations 1 and 2 (Capacity:  1750 lit/s, total pumping lift: 430 m)
  • CENTRIFLOC (centrifugal filtration) water treatment plant with a capacity of 1750 lit/s;
  • Primary transmission lines (diameter: 500–1300 mm, steel (St44, St37, St52),
  • Length 125 km, Working pressure: 25 Bar Max
  • Secondary transmission lines (diameter: 200–1000 mm, Steel–PE, Length: 137 km, Working pressure: 20 Bar Max)
  • Pumping station 3 (Capacity: 340 lit/s, pumping lift: 225 m)
  • 1000 cu. m balancing tank; 
Geography Location

Ben–Borujen Cities, Chaharmahal and Bakhtiari Province, Iran