Tuesday Jul 15, 2025
Revision Studies of the Shibloo Pumping Station ...
Project name: Revision Studies of the Shibloo Pumping Station, Water Transmission Network and Pipeline
Completed
2019/11/27
2019/11/27

West Azerbaijan Regional Water Company  

Revision and improvement of the current irrigation and drainage network plan, increasing the utilization of the potentials of the water resources and its development to the maximum level; 

1st and 2nd Phase Studies

  • Pump station with a capacity of 2.7 cu.m/s;
  • Steel water transmission pipes length: 15 km;
  • Canal length: 41 km;

Maku County, West Azerbaijan Province, Iran