Project name: Evaluation of the Potentials of Haraz River and its Tributaries (Nur and Baladeh) for Building a Hydroelectric Power Plant
Completed
2019/11/25
2019/11/27
Manager

Mazandaran Regional Water Company

Goals
  • Evaluating the potential of Haraz River and its tributaries (Noor, Baladeh) for building a hydropower plant, and preparing the tender documents for a B.O.O or B.O.T contracts.
Schedule

Identification and Potential Evaluation Studies

Executive Actions
  • Carrying out meteorological, hydrological, geological, seismic and studies, as well as evaluating access routes and producing a final report;
  • Screening and selecting eligible sites through economic–financial analysis;
  • Based on the study results, around 20 sites were located in the area with an overall potential for generating 56 MW of hydroelectric power;
  • Preparing tender documents for a B.O.O contract.
Geography Location

Haraz River, Mazandaran Province, Iran