Evaluation of the Potentials of Haraz River and its Tributaries ... Project name: Evaluation of the Potentials of Haraz River and its Tributaries (Nur and Baladeh) for Building a Hydroelectric Power Plant Status Completed Registration Date 2019/11/25 Update Date 2019/11/27 Manager Mazandaran Regional Water Company Goals Evaluating the potential of Haraz River and its tributaries (Noor, Baladeh) for building a hydropower plant, and preparing the tender documents for a B.O.O or B.O.T contracts. Schedule Identification and Potential Evaluation Studies Executive Actions Carrying out meteorological, hydrological, geological, seismic and studies, as well as evaluating access routes and producing a final report; Screening and selecting eligible sites through economic–financial analysis; Based on the study results, around 20 sites were located in the area with an overall potential for generating 56 MW of hydroelectric power; Preparing tender documents for a B.O.O contract. Geography Location Haraz River, Mazandaran Province, Iran