Friday Apr 19, 2024
Establishing and Supervising the Water and Agriculture Management System for 2, 3, 4, and 5 Sec. No. of Karamabad Project
Project name: Establishing and Supervising the Water and Agriculture Management System for 2, 3, 4, and 5 Sec. No. of Karamabad Project (Irrigation and Drainage Subnetwork of Karamabad Project)
Completed
2018/09/29
2019/12/01
Manager

Deputy of water and soil and industries of Ministry of Agriculture Jihad 

Goals
  • Study, Design and supervision of the construction of the 19250 hectare of Irrigation and Drainage subnetwork;
  • Investigating and establishing the management system.  
Schedule

Project supervision (3rd Phase)

Executive Actions
  • Irrigation method:  Semi-portable sprinkler, center-pivot, and localized irrigation
  • (drip tape) systems;
  • Pipe diameter: 63 - 450 mm, PE pipes
  • Constructing technical buildings;
  • Establishing cooperatives around the management of water resources. 
Geography Location

Poldasht and Shut Cities, West Azerbaijan Province, Iran