Saturday Oct 12, 2024
Consultancy services for the design and construction of the eastern tunnel part of the alternative drinking water transfer system of Alborz and Tehran provinces from Taleghan dam
Project name: Consultancy services for the design and construction of the eastern tunnel part of the alternative drinking water transfer system of Alborz and Tehran provinces from Taleghan dam
Future
2024/07/07
2024/07/07
Manager
Tehran Regional Water Company
Goals
Transfer of drinking water of Alborz and Tehran provinces from Taleghan Dam
Schedule
3nd Phase Studies
Executive Actions
  • Tunnel length: 16.5 km
  • Drilling with type TB.45E/TS mechanized drilling machine with segmentation to the finished diameter of 8.3 meters
  • Hexagonal segment type, the number of parts in each ring is 4 pieces with a length of 3.1 meters
  • Traditional drilling 980 meters long
  • The exit structure of the tunnel construction to the Karaj River
Geography Location
Alborz/ Amirkabir Dam